Programming/examining pressure profiles 
(cont.) 

Not all phases have to be used, enter a 0 time and 
that phase will not be used. The screens that follow 
show the rest of this example profile

Phase 7 is 

unused shown by a value of 0 seconds

. It is not 

necessary to put 0.0 bar as well. 

 

One useful tip

, if just a small change is desired, 

after touching the "Tick" Icon to save the value, 
raising and lowering the brew lever returns you to 
the Main menu screen. 

 

 

 

 

 

Profile advice 

The Vesuvius has advanced pressure profiling 
capabilities but everyone's taste is different, so 
some suggestions to get you started below 

assuming a pump acceleration value of 400 
(factory setting)

. Always remember, although you 

have 7 phases for each profile, you don't have to 
use them all. 

Phase 1 Preinfusion times for the first low 
pressure phase 

You can choose to move straight to maximum 
pressure, but the Vesuvius benefits from a 
preinfusion phase. 

Note: the preinfusion chamber 

within the E61 group has been disabled, as it's 
operation interferes with pressure profiling.

  

 
Preinfusion, times shorter than 3 seconds will be  
ineffective as this will mainly be lost in filling the 
inactive preinfusion chamber in the E61 group and 
the space above the coffee puck. The filling of the 
redundant E61 preinfusion chamber also makes a 
pre-flush unnecessary prior to pulling a shot. 
 
Preinfusion times of 6 - 14 seconds have given good 
results. With better grinders, even longer times may 
be of benefit.  Preinfusion pressures can be anything 
you want, but not lower than 2 bar,  testing has 
mainly been with 2 bar preinfusion pressures. Early 
testing did not show any benefits with pressure 
lower than 2 bar due to low flow rates from the 
pump. 
 
One of the reasons the Vesuvius always supplies 
the pump from it's internal tank, is to allow 
preinfusion pressures lower than mains line 
pressure (usually much higher than 2 bar). 

Summary of Contents for Vesuvius

Page 1: ...ia L Guerra 9 80040 Cercola NA Ph Fax 39 0815552428 e mail info mevsrl net M V S r l vesuvius userguide10 June 2015 doc Page 1 of 24 Information Technology Solutions VESUVIUS OWNERS MANUAL VESUVIUS OW...

Page 2: ...lay programming functions 9 Main Vesuvius Screens 9 Turning the Steam Service boiler on or off 10 Main Menu Screen 11 Eco Mode Explained 12 Eco Mode Explained cont 13 The profile screen 15 Programming...

Page 3: ...r your dealer Always keep all packaging including any plastic bags internal packing screws and rubber transit feet etc All packing materials should be kept out of reach of children and disposed of res...

Page 4: ...cedure should be used 1 All 4 screws securing the lid should be removed There are 1 on each side shown by the arrows 4 in total Note they are NOT on the top 2 The sides of the crate are secured by 4 m...

Page 5: ...when plumbing in Use the flexible hose provided with the machine connect it to a connection hose 3 8 male with a shut off valve The use of a water softer or filtration system is advised The drip tray...

Page 6: ...the firmware has loaded turn the machine on from the front panel Within a few moments the pump may start to run 3 Lift the brew lever always do this 4 the water level in the tank should fall and withi...

Page 7: ...Height adjustable feet Cup Warmer rack Dot matrix display Touch sensitive Brew and steam boiler LEDs lights when heating Water wand ball joint mounted no burn Toggle Valve to draw water Drip tray remo...

Page 8: ...uminated on off rocker switch Side Panel access toggle Removable panel access heating element removal service boiler drain plug Plumbed Tanked operation rocker switch Illuminated when set for plumbed...

Page 9: ...oiler temperature and pressure The next Zone shows what pressure profile is being used and this is a sideways scrolling display The third zone has a tank water level indicator which actually only show...

Page 10: ...Please note that the steam on off function is completely independent of ECO mode So Eco Steam above might be highlighted but if the steam function is not switched on nothing happens and the steam boil...

Page 11: ...ely be returned to the Home screen Note this only works if ECO mode is enabled via the Time Economy option page 20 is set to a value other than 0 1 3 2 4 Eco Steam mode only affects steam boiler recom...

Page 12: ...time to warm up again In full eco mode both boilers the display switches to green when it enters ECO mode ECO setting is most useful when restricted to operate on the Steam boiler only Touch to highl...

Page 13: ...you may decide to put the Vesuvius straight back into Eco mode Again if it helps think of this fairly quick procedure as 2 touches on the lower right corner of the display followed by 2 touches on th...

Page 14: ...Touch to change time and day Touch to access service menu Does nothing touch to continue This actually shows E61 group lever operations The Vesuvius has an internal On Off timer with 2 on off times ea...

Page 15: ...rofiles The profiling system is very easy to use and can achieve results as simple or complex as you care to program After you touch and hold a profile icon P1 for 5 seconds you will enter this screen...

Page 16: ...ve to use them all Phase 1 Preinfusion times for the first low pressure phase You can choose to move straight to maximum pressure but the Vesuvius benefits from a preinfusion phase Note the preinfusio...

Page 17: ...suvius uses pressure transducer commercial valve system and PID algorithm to control pump pressure Although not perfect it is better than a simple on off control which would be unable to manage rapidl...

Page 18: ...24V 110W commercial unit Low water alarm Visual only Feet Metal height adjustable Steam and hot water wands Ball joint no burn Steam on left water on right Portafilters 2 1 single and 1 double spout...

Page 19: ...at the point indicated for 10 seconds The options are shown in the order they appear Increase or decrease to improve visibility for particular display setting Set this to your preference can be normal...

Page 20: ...fill level leave on Mid Low allows higher boiler water level High is less Both boilers heat at once or brew boiler priority if enabled Reduces max power consumption to 1500W approx Does nothing impor...

Page 21: ...ore 1 Closing the mains water solenoid preventing flooding if a fault develops on a plumbed machine 2 Showing the red fill tank screen when the water level is low 3 The length of time the pump will ru...

Page 22: ...repair may be very simple e g a leaking high pressure PTFE pipe joint and the dealer can talk you through quickly fixing it At other times it may be more serious and require the machine to be returned...

Page 23: ...he sensitivity of the water sensor 1 loosen the 2 allen keys holding the sensor 3 unscrew the central screw in order to make better pictures we removed the side panel but you can do this also without...

Page 24: ...uerra 9 80040 Cercola NA Ph Fax 39 0815552428 e mail info mevsrl net M V S r l vesuvius userguide10 June 2015 doc Page 24 of 24 Information Technology Solutions V ESUVIUS OWNERS MANUAL Appendix 2 Elec...

Reviews: