12•
MM AND HD LOADER DETACHMENT
IMPORTANT
THE FLOATING POSITION MUST be maintained until the end
of the detachment.
10
IMPORTANT
Never detach the loader without a tool, choose a flat and stable surface.
This manoeuvre will only be done by the driver who will leave his seat and FORBID
any manoeuvre whilst he is working on the loader.
Use all the commands on the engine lower flow.
PROCEDURE
CHOOSE a FLAT and STABLE surface.
1• TOOL at least 1 meter from the ground. Put the tool in its
MAXIMUM DIGGING POSITION.
2• LOWER the loader’s arm.
3• PUSH the lowering lever as far as possible PUT INTO FLOATING
POSITION.
4• TIP the tool to put it FLAT on the ground.
Engage the hand break.
5• CHECK the lift cylinder’s travel dimension 20mm minimum.
6• Position the parking PROPS using the original pins.
7• UNLOCK the left side, using the lever. The loader will drop
down slightly.
UNLOCK the right side, same as for the left side.
8• CHECK the pin’s clearance in relation to the hooks; otherwise
lightly push the lever towards tipping. KEEP IN A FLOATING
POSITION.
9• DISCONNECT the hydraulic plugs or the Manip Fast (depending
on options) (see pages 14 and 15 HYDRAULIC COUPLING).
10• Put the flex away in the according support.
Put the protective caps on the couplings, or shut the
protective hood for the Manip Fast (according to option).
Return to the tractor cab and check that the 2 axles are off
the hooks.
11• Slowly REVERSE the tractor making sure that nothing gets
caught up.
12• CHECK the stability of the loader on its props.
ATTENTION
THE LOADER
CAN DROP DOWN
DURING THIS
MANOEUVRE
PINCHING
RISKS
(manipulate
with caution).