H3 - Fitting slings on the lifting platform
FITTING SLINGS
- Keep in mind the position of the lifting platform’s centre of gravity for lifting it.
- Insert hooks in the anchoring points provided for this purpose.
- Lower the lifting platform completely. Ensure that the extension, the controls and the cowls are all secured. Remove any elements not
fastened to the machine.
- Determine the machine’s centre of gravity using the table and the illustration on this page.
- Attach the tying elements only to the lifting points specified on the machine.
- Adjust the assembly to avoid damaging the machine and to keep it level.
Centre of gravity
Axis X
Axis Y
78
SEC
50,8
cm
49,5
cm
100
SEC
82,2
cm
59,3
cm
120
SE
83,7
cm
59,9
cm
Axe Y
Points
de levage
sur le châssis
Points
de levage
sur l’échelle
Points
de levage
sur l’échelle
Points
de levage
sur le châssis
Axis
X
Axe Y
Axis
X
78 SEC
100 SEC
120 SE
Lifting
points
on the ladder
Lifting
Points
on the chassis
Lifting
points
on the ladder
Lifting
Points
on the chassis
Axis Y
Axis
X
Axis Y
Axis
X
78 SEC
100 SEC
120 SE
647369
(01/03/2017)
78/100
SEC
2
/ 120
SE
2
Summary of Contents for 100 SEC 2
Page 1: ...OPERATOR S MANUAL ORIGINAL INSTRUCTIONS EN 01 03 2017 647369 78 SEC 2 100 SEC 2 120 SE 2...
Page 6: ...1 2 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 25: ...1 21 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 35: ...2 1 2 DESCRIPTION 2 DESCRIPTION 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 36: ...2 2 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 39: ...2 5 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 45: ...2 11 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 47: ...2 13 DIAGRAM 78 SEC 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 49: ...2 15 DIAGRAM 100 SEC 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 51: ...2 17 DIAGRAM 120 SE 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 58: ...2 24 78 SEC LIFTING PLATFORM EQUIPMENT 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 60: ...2 26 100 SEC LIFTING PLATFORM EQUIPMENT 11 1 6 20 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 62: ...2 28 120 SE LIFTING PLATFORM EQUIPMENT 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 76: ...2 42 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 77: ...3 1 3 MAINTENANCE 3 MAINTENANCE 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 78: ...3 2 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 102: ...3 26 647369 01 03 2017 78 100 SEC 2 120 SE 2...