2-33
MODEL 2 (9
AND
10)
9-1 L
IFT
FUNCTION
BUTTON
- Push this button (9d) to activate the lift function and follow the instructions paragraph 10.
9-2 D
RIVE
FUNCTION
BUTTON
- Push this button (9e) to activate the drive function and follow the instructions paragraph 10.
10- P
ROPORTIONAL
CONTROL
LEVER
AND
TRANSLATION
/
LIFTING
FUNCTION
CONFIRMATION
SWITCH
- TRANSLATION : Move the control lever in the direction indicated by the white arrow on the
control panel to move the machine forward in the direction indicated by the white arrow. Move
the control lever in the direction indicated by the black arrow on the control panel to move the
machine forward in the direction indicated by the black arrow.
- LIFTING : Move the control lever in the direction indicated by the white arrow on the control
panel to lift the platform. Move the control lever in the direction indicated by the black arrow
to lower the platform.
- The joystick has a so-called “Dead Man’s” push button. This must be pressed down at the same
time as any movement is instructed. Releasing it stops the movement.
When the lifting platform descends, it must stop at approx. 2.1 m above the
ground. Ensure that the area under the lifting platform is clear and free of any
obstacles before continuing the manoeuvre. To continue to lower the lifting
platform, release the control lever and then operate it again 5 seconds later.
10
9d
9e
647369
(01/03/2017)
78/100
SEC
2
/ 120
SE
2
Summary of Contents for 100 SEC 2
Page 1: ...OPERATOR S MANUAL ORIGINAL INSTRUCTIONS EN 01 03 2017 647369 78 SEC 2 100 SEC 2 120 SE 2...
Page 6: ...1 2 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 25: ...1 21 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 35: ...2 1 2 DESCRIPTION 2 DESCRIPTION 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 36: ...2 2 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 39: ...2 5 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 45: ...2 11 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 47: ...2 13 DIAGRAM 78 SEC 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 49: ...2 15 DIAGRAM 100 SEC 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 51: ...2 17 DIAGRAM 120 SE 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 58: ...2 24 78 SEC LIFTING PLATFORM EQUIPMENT 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 60: ...2 26 100 SEC LIFTING PLATFORM EQUIPMENT 11 1 6 20 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 62: ...2 28 120 SE LIFTING PLATFORM EQUIPMENT 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 76: ...2 42 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 77: ...3 1 3 MAINTENANCE 3 MAINTENANCE 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 78: ...3 2 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 102: ...3 26 647369 01 03 2017 78 100 SEC 2 120 SE 2...