- Always chock the machine’s wheels in preparation for transport.
- Retract and tie down the lifting platform’s extension unit.
- Use the tie-down points on the chassis to fasten the machine to the truck bed’s surface
(Figs. E and F).
- Use at least two chains or straps.
- Use chains or straps with sufficiently large load-retaining strength.
- Fasten chocks to the truck bed in front of and behind each of the lifting platform’s tyres
1 (Fig. E).
- Also fasten chocks to the truck bed on the inside and outside of each tyre 1 (Fig. F).
- Turn the ignition switch to the OFF position and remove the key before transport.
- Inspect the whole machine to discover any loose or poorly fastened elements.
- If the ramps have been folded, tie them down with straps before transport.
U
NLOADING
Please adapt the lifting platform’s translation speed by controlling it
with the translation joystick.
598895
598895
F
598895
598895
E
598895
598895
F
598895
598895
E
78 SEC
100 SEC
120 SE
78 SEC
100 SEC
120 SE
1
1
1
1
1
1
1
1
1
1
1
1
647369
(01/03/2017)
78/100
SEC
2
/ 120
SE
2
Summary of Contents for 100 SEC 2
Page 1: ...OPERATOR S MANUAL ORIGINAL INSTRUCTIONS EN 01 03 2017 647369 78 SEC 2 100 SEC 2 120 SE 2...
Page 6: ...1 2 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 25: ...1 21 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 35: ...2 1 2 DESCRIPTION 2 DESCRIPTION 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 36: ...2 2 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 39: ...2 5 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 45: ...2 11 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 47: ...2 13 DIAGRAM 78 SEC 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 49: ...2 15 DIAGRAM 100 SEC 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 51: ...2 17 DIAGRAM 120 SE 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 58: ...2 24 78 SEC LIFTING PLATFORM EQUIPMENT 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 60: ...2 26 100 SEC LIFTING PLATFORM EQUIPMENT 11 1 6 20 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 62: ...2 28 120 SE LIFTING PLATFORM EQUIPMENT 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 76: ...2 42 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 77: ...3 1 3 MAINTENANCE 3 MAINTENANCE 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 78: ...3 2 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 102: ...3 26 647369 01 03 2017 78 100 SEC 2 120 SE 2...