3-15
B - EVERY 50 HOURS OF OPERATION
Perform the operations described above as well as the following operations.
B1 - Battery electrolyte level
CHECK
- Check the electrolyte level in each element of the battery.
- Ensure that every electrolyte level is at the bottom of the ventilation well (Fig. B1-1)
- If the ambient temperature is high, check the level more often than every 50 hours of
operation.
Manipulating and maintaining a battery can be dangerous; take the
following precautions:
- Wear protective goggles.
- Wear gloves
- Keep the battery horizontal when manipulating it.
- Never smoke or work close to a naked flame.
- Work in a sufficiently well-ventilated area.
- If any electrolyte splashes onto your skin, thoroughly rinse the area
with cold water for 15 minutes and call a doctor.
- Battery level indicator: use the Diagnostic LED to determine the level in the batteries
(Fig. B1-2).
- Remarks: when the code “LO” flashes on the lifting platform’s LED control screen,
put the machine out of service and charge the batteries; otherwise all the machine’s
functions will be deactivated.
B2 - Steering pivot axes
GREASE
- Clean, then grease the
grease points
Rep.1 (Fig.2), (See chapter “LUBRICANTS”) and
remove any surplus.
=
=
+ -
+ -
=
=
+ -
+ -
=
=
+ -
+ -
Pleine charge
Mi-charge
Charge faible
=
=
+ -
+ -
« LO » clignote
B1-2
B2
1
B1-1
(1) Battery electrolyte level
(A) Too low - (B) Moderate
(C) Too high
647369
(01/03/2017)
78/100
SEC
2
/ 120
SE
2
Summary of Contents for 100 SEC 2
Page 1: ...OPERATOR S MANUAL ORIGINAL INSTRUCTIONS EN 01 03 2017 647369 78 SEC 2 100 SEC 2 120 SE 2...
Page 6: ...1 2 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 25: ...1 21 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 35: ...2 1 2 DESCRIPTION 2 DESCRIPTION 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 36: ...2 2 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 39: ...2 5 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 45: ...2 11 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 47: ...2 13 DIAGRAM 78 SEC 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 49: ...2 15 DIAGRAM 100 SEC 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 51: ...2 17 DIAGRAM 120 SE 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 58: ...2 24 78 SEC LIFTING PLATFORM EQUIPMENT 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 60: ...2 26 100 SEC LIFTING PLATFORM EQUIPMENT 11 1 6 20 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 62: ...2 28 120 SE LIFTING PLATFORM EQUIPMENT 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 76: ...2 42 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 77: ...3 1 3 MAINTENANCE 3 MAINTENANCE 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 78: ...3 2 647369 01 03 2017 78 100 SEC 2 120 SE 2...
Page 102: ...3 26 647369 01 03 2017 78 100 SEC 2 120 SE 2...