3 - 32
REPLACE
Gearbox oil
CLEAN
Speed sensor
t
IMPORTANT
t
Operation to be carried out the first time after 100 hours of service, periodically every 1000 hours of service.
Position the truck on level ground, with the engine switched off and the oil in the gearbox still hot.
Place a container under the drainage plug 1 (E11).
Unscrew plug 1 (E11) and let the oil flow out.
Remove the filler plug 2 (E11) to ensure complete drainage.
Refit the plug and tighten it 1 (E11) (35-50 N · m).
Speed sensor cleaning 5 (E11/1):
Loosen the screw and remove the speed sensor 5.1 (E11/1).
Loosen the screw and remove the speed sensor 5.2 (E11/1).
Install the speed sensor (Loctite 270), and tighten the screw to a torque of 9.5 - 11 N·m 5.3 (E11/1).
Install the speed sensor (Loctite 270), and tighten the screw to a torque of 9.5 - 11 N·m 5.4 (E11/1).
Fill the cup with the right quantity of new hydraulic oil (see: 3 - MAINTENANCE: LUBRICANTS AND FUEL) through the filler
hole 3 (E11).
Refit the filler plug 2 (E11) (35-50 N · m).
When the oil is hot, check the level and top up, if necessary.
The level is correct when the oil level is flush with the edge of the hole 3 (E11).
Check for leakage from the drainage plug 1 (E11).
Loctite 270
9,5 - 11,5 N·m
Loctite 270
9,5 - 11,5 N·m
2 3
1
5.1
5.2
5.3
5.4
5
5
5
E11
649100 EN-US-AU (20/05/2019)
MLT 961-145 V PLUS L JD ST4 S1
Summary of Contents for MLT 961-145 V PLUS L JD ST4 S1
Page 5: ...1 1 1 O P E R AT I N G AND SAFET Y INSTRUCTIONS ...
Page 6: ...1 2 649100 EN US AU 20 05 2019 MLT 961 145 V PLUS L JD ST4 S1 ...
Page 7: ...1 3 ...
Page 13: ...1 9 Page intentionally left blank ...
Page 31: ...1 27 ...
Page 37: ...2 1 2 DESCRIPTION ...
Page 38: ...2 2 649100 EN US AU 20 05 2019 MLT 961 145 V PLUS L JD ST4 S1 ...
Page 49: ...2 13 This page is intentionally blank ...
Page 55: ...2 19 LOAD CHART ...
Page 91: ...2 55 This page is intentionally blank ...
Page 109: ...3 1 3 MAINTENANCE ...
Page 123: ...3 15 This page is intentionally blank ...
Page 129: ...3 21 This page is intentionally blank ...
Page 135: ...3 27 This page is intentionally blank ...
Page 145: ...3 37 This page is intentionally blank ...
Page 157: ...4 OPTIONAL ATTACHMENTS FOR USE WITH THE RANGE 4 1 ...
Page 158: ...4 2 649100 EN US AU 20 05 2019 MLT 961 145 V PLUS L JD ST4 S1 ...
Page 160: ...4 4 649100 EN US AU 20 05 2019 MLT 961 145 V PLUS L JD ST4 S1 ...
Page 170: ...14 649100 EN US AU 20 05 2019 MLT 961 145 V PLUS L JD ST4 S1 ...
Page 171: ...5 LOAD CHARTS FOR INTERCHANGEABLE EQUIPMENT ...
Page 173: ...MLT 961 145 V PLUS L JD ST4 S1 ...
Page 174: ...649100 EN US AU 20 05 2019 MLT 961 145 V PLUS L JD ST4 S1 ...
Page 175: ...5 5 MLT 961 104JD ST4 S1 ...
Page 176: ...5 6 IT MLT 961 104JD ST4 S1 649100 EN US AU 20 05 2019 MLT 961 145 V PLUS L JD ST4 S1 ...
Page 177: ...5 7 MLT 961 104JD ST4 S1 ...
Page 178: ...5 8 IT MLT 961 104JD ST4 S1 649100 EN US AU 20 05 2019 MLT 961 145 V PLUS L JD ST4 S1 ...
Page 179: ...5 9 MLT 961 104JD ST4 S1 ...
Page 180: ...5 10 IT MLT 961 104JD ST4 S1 ...