D.
Put the damper door, which was rem oved on an earlier step, in the ice chute. Rotate the dam per door. With the
door in the open position, the counterweight should trip th e micro-switch lever. When you hear the micro-switch
giving a clicking sound, y ou know the door is operating properly . If y ou don’t hear the switch clicking, loosen
the screws on the switch housing and move it closer to the counterweight.
E.
To install the center ice chute “B”, the widest part of the chute is the top, and the flanged side should face the
front of the ice m achine. Insert the top of the center ice chute into the lower m achine ice compartment and slide
the top of the chute into the upper m achine ice chute opening from the bottom until it clears ice chute “A”. After
it clears the lower ice chute, let it sit on the chute and proceed to step F.
F.
Place upper ice chute “C” into ice chute opening of the top ice machine base. Make sure the bin control bulb has
clearance between the base opening and ice chute.
G.
Place damper door in ice chute. Make sure the damper door trips the micro-switch when opened. If not, return to
part 3, step D.
H.
The center chute “B” fits over the outside of the upper chute. From inside the lower ice compartment, slide center
ice chute “B” onto the upper chute “C”. Fasten center chute to the upper chute with four sheet metal screws.
I.
Take the bottom of the center chute and align the rivnuts on th e sides of the chute with the slots on the side of ice
chute “A”. The bottom of the center chute fits on the in side of the lower chute. Take a knurled m achine screw
and a lock washer and place in slot on lower chute. Tighten screw into rivnut.
J.
Place center chute cover “D” on center chute and screw in place with ten sheet m etal screws. Drive six screws
through the cover into center chute, two screws into upper chute, two screws into lower chute.
K.
Replace water pump in lower ice machine (see part 3, step A).
4. Bin Control Setting:
A.
The top machine should shut off when the ice level in th e storage bin reaches the bulb. If the top machine shuts
off with the ice level in the bin above the control bul
b, turn the black knob m arked colder counterclockwise
approximately 1/4 turn. If the ice level is below the bul b when the top ice m achine shuts off, turn the knob 1/4
turn clockwise.
B.
Proceed to service manual for electrical and water hook-up and start-up procedure.
Parts List
Part Number Description
Quantity
Required
6555414
Lower Ice Chute Assembly
1
6820824
Center Ice Chute Assembly
1
6555714
Upper Ice Chute Assembly
1
157481
Center Ice Chute Cover
1
5124641
#8 Sheet Metal Screws, Type B
20
5544591
#8 Shakeproof Lock Washers
20
5012041
Knurled Machine Screws
2
2350041
Ranco Bin Thermostat Control w/Bracket
1
302461 Bulb
Bracket
1
5650031 Plastic
Clamps
4
6026444
Top Cover Assy.
1
8000893
Sheet 2 of 2
Rev. 06/06/01