53
RFF0620/RNF0620/RNF1100/RFF1300
Troubleshooting
SELF-CONTAINED AIR-COOLED
Normal Operation
When the toggle switch is placed in the ON position the
following controls must be in the closed position before
the ice machine will start:
A. Bin Thermostat
B. High Pressure Cut-out Switch
C. Ice Chute Safety Switch
D. Low Pressure Switch
E. Low Water Level Switch
NOTE: Placing the toggle switch in the ON position starts
the gear motor. After 8 minutes of correct rotation the
time delay ends and the compressor starts. The ice
machine will continue to make ice until ice contacts the bin
thermostat. The ice machine remains off until ice no longer
contacts the bin thermostat.
ROTATION SENSOR OPERATION
Light
Definition
Yellow Blinking
Time Delay Period
Yellow Solid
Normal Operation Sensing
Red Blinking 2
Flashes Per Second
Time Delay Period - First 1 To 7 Faults
Red Solid
Lockout - 8 Consecutive Faults Due To A
Speed Fault
Remove/Restore Power To Reset
Red Blinking Slowly
Lockout - 8 Consecutive Faults Due To A
Short Circuit
See “Rotation Sensor” on page 85 for sequence of operation
Summary of Contents for RFF
Page 2: ......
Page 34: ...THIS PAGE INTENTIONALLY LEFT BLANK 34 Part Number 000015433_03 5 20 ...
Page 146: ...THIS PAGE INTENTIONALLY LEFT BLANK 146 Part Number 000015433_03 5 20 ...
Page 160: ...THIS PAGE INTENTIONALLY LEFT BLANK 160 Part Number 000015433_03 5 20 ...
Page 161: ......
Page 162: ......
Page 163: ......