66
RFF2500 Troubleshooting
SELF-CONTAINED AIR-COOLED
Normal Operation
When the toggle switch is placed in the ON position the
following controls must be in the closed position before
the ice machine will start:
A. Bin Thermostat
B. High Pressure Cut-out Switch
C. Ice Chute Safety Switch
D. Low Pressure Switch
E. Low Water Level Switch
Placing the toggle switch in the ON position starts the
gear motor. After 8 minutes of correct rotation the time
delay ends and the compressor starts. The ice machine will
continue to make ice until ice contacts the bin thermostat.
The ice machine remains off until ice no longer contacts
the bin thermostat.
ROTATION SENSOR OPERATION
Light
Definition
Yellow Blinking
Time Delay Period
Yellow Solid
Normal Operation Sensing
Red Blinking
Fault Time Delay Period
Red Solid
Lockout - 8 Consecutive Faults
Remove/Restore Power To Reset
See “Rotation Sensor” on page 85 for sequence of operation
Summary of Contents for RFF
Page 2: ......
Page 34: ...THIS PAGE INTENTIONALLY LEFT BLANK 34 Part Number 000015433_03 5 20 ...
Page 146: ...THIS PAGE INTENTIONALLY LEFT BLANK 146 Part Number 000015433_03 5 20 ...
Page 160: ...THIS PAGE INTENTIONALLY LEFT BLANK 160 Part Number 000015433_03 5 20 ...
Page 161: ......
Page 162: ......
Page 163: ......