Installation Guidelines

 

11/18

page 1 of 7

For more information, contact your local Mannington representative or visit manningtoncommercial.com

Crafted with purpose

GENERAL INFORMATION

Contact Mannington Technical Services for guidance about subfloor testing and installation recommendations. 
Technical Services can be reached Monday to Friday, 8:00 a.m. to 5:00 p.m. EST at 800.241.2262 ext 3.

These instructions cover all fully adhered installations of Mannington Commercial Luxury Vinyl Floors (LVF) – this 
includes both Tile (LVT) and Plank (LVP). This includes: 

Amtico, Amtico 30, Spacia and Spacia First. 

All recommendations 

are based on the most recent available information. The information on these sheets provides general guidelines. For 
complete details consult Mannington’s General Installation Guide or visit our website at manningtoncommercial.com. 
These instructions and recommendations must be followed for a satisfactory installation.

The installation of Mannington LVF is straightforward and similar to the installation procedures that apply to all quality 
resilient floors. Good preparation is essential for a trouble-free installation. Do not install Mannington LVF until job-site 
testing and subfloor preparations are finished and the work of all other trades is complete. Site conditions must comply 
with the relevant building codes and local, state and national regulations. 

•   Mannington LVF is recommended for use over properly prepared concrete, suspended wood, metal and other suitable 

substrates. Never install Mannington LVF over residual asphalt type (Cutback) adhesive as “Bleed Through” may 
occur.

•   Mannington LVF is not suitable for external installation or unheated locations.
•   Mannington flooring, adhesive, job-site and subfloor must be acclimated to a stable condition before installation.  

(See Job-site Testing).

•   Following installation, Mannington LVF foot traffic should be minimized for 24 hours; point loads and rolling traffic 

should be minimized for 48 hours, and utilize minimal wet cleaning for 5 days 

(except XpressStep)

.

•   Mannington LVF flooring should remain at a temperature between 55°-85°F (13°-29°C) during its service life.
•   Adhesive types can have a significantly different moisture tolerance which can influence required subfloor prep as 

well as install time.

MATERIAL RECEIVING, HANDLING & STORAGE

1.   All floor covering products require care during storage and handling. It is important to store flooring products in a dry, 

temperature-controlled interior area.

2.   The temperature range should be between 65°-100°F, and the relative humidity should be controlled and maintained 

between 30-70%.

3.  Material must be conditioned for at least 48 hours before beginning the installation.
4.  Flooring materials that are shipped in cartons must also be stored properly. Cartons must be kept squarely 

positioned on the pallet to prevent distortion of the contents and to be fully supported. Do not store close to exterior 
walls, in direct sunlight or near HVAC vents.

5.  Stored cartons are to be protected from forklift and other traffic that can damage carton corners. Never double-

stack pallets of flooring products.

6.  Immediately remove all shrink wrapping before acclimation and verify materials delivered are correct style, color and 

quantity.

Amtico, Amtico 30, Spacia & Spacia First Luxury Vinyl Flooring 

Installation Guidelines 

Summary of Contents for Amtico

Page 1: ...Cutback adhesive as Bleed Through may occur Mannington LVF is not suitable for external installation or unheated locations Mannington flooring adhesive job site and subfloor must be acclimated to a st...

Page 2: ...of water directly onto the concrete subfloor If the water droplet does not dissipate within 60 to 90 seconds the subfloor is considered non porous Concrete subfloors must have a minimum compressive s...

Page 3: ...ilient Floor Covering Institute RFCI document Recommended Work Practices for Removal of Existing Resilient Floor Coverings for guidance www RFCI com 5 Perform corrective actions necessary for elevated...

Page 4: ...manent HVAC source is utilized it must provide proper control of both temperature and humidity to recommended or specific levels for the appropriate time duration 2 Flooring materials Check that the q...

Page 5: ...t each tile for visual defects before installing Installation of the flooring implies acceptance of materials Adhesives Mannington adhesives are specifically formulated to be fully compatible with bac...

Page 6: ...rs with a history of moisture problems Important Temperature directly affects adhesive working and setting times Warmer temperatures shorten working times and colder temperatures lengthen working time...

Page 7: ...sure for long periods of time should utilize window treatments and or utilize Amtico RP18 Adhesive in these areas 3 Protecting new installations New installations must be protected while the adhesive...

Reviews: