PANEL INSTALLATION
EXTENSION BOX INSTALL ATION
1.
For ease of product installation, the main front panel
of the tub is attached to the frame where it cannot
be easily removed. To access product components
and underneath the tub, there are access panels that
are attached to the main front panel with magnets.
These access panels are easily removed by using a
non-sharp object to gently pry the panel from where
it is magnetically attached.
2.
One end panel is provided with the Walk-in bath.
It can be installed on either end as required by the
layout of the bathroom. Attach the tub panels using
the magnets by sliding the panel upward to match
the top edge of the tub. Seal the panels to the tub
and apply a finishing seal around the creases of the
tub with suitable caulking or silicone sealant.
3.
ETL, CSA, IAPMO and UL require a tile flange to be
installed in accordance with local building codes.
The tile flange kit is sold as an option.
1.
The extension box is cosmetic and is designed to cover a frame and give the appearance of an extension of
the tub.
2.
Follow the detailed installation instructions provided with the extension box kit.
DOOR DRAIN INSTALL ATION
1.
Install Drain fitting and Drain shoe according to manufacturer’s instructions.
2.
Glue Door drain coupler to Drain shoe with PVC Cement Glue leaving the Tubing barb in a horizontal position
pointing toward the door side. Note: Before attaching the tubing to the drain make sure the barb coupler
is clear with no obstruction.
3.
Gauge the length of the pre-installed tubing from the Door drain required to attach to the coupler barb.
4.
Attach tubing to barb.
5.
Proceed with Waste and Overflow Installation.