DMJOIL101EN - v1
VISIO L1H OPERATOR -
INSTALLATION MANUAL
22
8.1
8.2
8.3
8.4
Fig.
Fig.
Fig.
Fig.
d
e
p
e
n
d
s o
n
fr
a
m
e
di
m
en
si
on
s
Floor guides position. (On the side of the fixed leaf as
shown in the diagram)
8.1
Mark the floor, using the metal guide as a template.
8.2
Position the guide as shown in the diagram.
8.3
Drill the floor in accordance with the marks.
8.4
Fig.
Fig.
Fig.
Fig.
8.1.1 Mark and drill the floor.
8.1 FLOOR GUIDES ASSEMBLY
8. GUIDE AND SLIDING LEAF ASSEMBLY