DMJOIC201EN - v2
VISIO C2H OPERATOR -
INSTALLATION MANUAL
8
Fig.
2.8
Fig.
2.7
i
Use a previously assembled trolley as
shown in the diagram.
Adjust the top wheel as shown in diagram.
Introduce the trolley on the top stile as
shown in diagram.
Slide the trolley along the whole length of
the main profile as shown in the diagrams.
Use a hand to help position the track rail.
Fig.
2.8
Fig.
2.7
Fig.
2.6
Fig.
2.6
Fig.
2.6
2.3 ADJUST TRACK PROFILE