background image

Congratulations on the purchase of your new Johnson Suisse ESTI bath. Please read these instructions carefully.

.

Unpack and check for damage. Any damage should be reported to Gemini within 2 working days. Gemini reserve 
the right to reject any claim for damage if not notified in a timely manner.

.

Protect the bath during the installation. Damage and scratching incurred during installation are not covered by the 
warranty.

1. Before installation set out the pipe work for the bath and ensure it is aligned with the waste.
2. Clean the base of bath and install the bath legs according to supplied instructions.
3. To prevent scratching of the enamelled surface use a clothunder the bath.

70

A

Width

a

a

!

a

1

2

4

5

40 

6

7

8

2/4

4.

the bath is clear of any obstructions.

5. Mark the height of the bath tub on the wall to provide the guidelines for the bath rim supports. Note that the pipe work

and trap must have 10mm clearance to the floor.

Place in position and use the adjusting screws to ensure the bath is completely level. Make sure that the underside of 

6. The bath rim should be supported on the sides against the wall.

Method A: Installation with Legs

ESTI VITREOUS ENAMELLED STEEL BATH

INSTALLATION INSTRUCTIONS

Bath Width  1500

1700

A

620

820

I0089

Alcohol

Reviews: