background image

= ( Board Thickness)  +  ( Tiling Thickness)

9

10

11

12

All dimensions are in millimetres and are subject to normal manufacturing variation.

As product development is ongoing Gemini reserves the right to vary specifications without notice

3/4

7.
8. A minimum gap of 1- 3mm between the bath and wall/tiles is recommended to provide space for normal exp ansion of

bath in different temperatures. This gap will be filled with silicon.

9. After fixi ng the bath into position connect approved DN40 waste fittings and pipe.
10. O nce the connections are completed fill the bath tub with water,  wait for 2 hours and check for water leaks.
11. Complete the installation of bath by either desired method ( Timber frame or masonry)

Note use 40x4 0mm timber when constructing a frame with vertical studs at 450- 500mm centres.  Suggested frame

height is 500mm. ( The height varies depending on the shape of the trap and fittings)

12. When cladding the base wall it is recommended that a removable panel provided to allow access to the waste pipe

for any service that may be req uired in the future.

13. Apply flexi ble sealant to all exp osed edges.
14. The bath can be used after 24 hours.

Position and fix  the bath legs to the floor using a pad of silicon.

ESTI VITREOUS ENAMELLED STEEL BATH

INSTALLATION INSTRUCTIONS

I0089

F lush Mounted

Built- in

Reviews: