1900082 REV.1
Page 2 of 4
Installation details:
Power Supply:
Oceanic (8.4kW/400Vac. 3 PHASE) - This unit must be connected to a suitable 3 phase
power supply. This should be done by a qualified electrician.
Water Pressure:
5 - 50 psi (min.-max.) 35 - 345 kPa (min.-max.)
Installation procedure:
Fit a stop Valve on a cold water line and attach a 3/4" BSP male fitting,
(e.g. 3/4" x 1/2" 311 or washing machine type stop valve).
Connect straight tailpiece of the hose to the stop valve fitting. Make sure that the pre -
attached sealing washer is fitted.
Turn on the water to flush any impurities, dust etc from the inlet hose and water pipe. Allow
several gallons through.
Connect right-angled tailpiece of the hose to the inlet valve of the boiler (again 3/4" BSP).
Make sure the sealing washer is fitted here also.
Turn on water and check for leaks.
Connect to a suitable power supply.
Font Installation:
Counter Drilling:
Holes need to be drilled in the counter for the mounting bolts (6-10mm diameter). 4 holes are in
the base plate. Please use the dimensions shown below. A large hole needs to be drilled in the
counter (35mm diameter) for routing feed pipes and control wires.
Font Assembly:
Turn off the machine. The fonts are attached to the drilled counter with 4 x M6 nuts, bolts and
washers (all parts are found in the drip tray). A rubber grommet fits into the font base plate to
prevent the wire cutting against the steel edge. The silicone hose from the boiler is secured to the