enough (depending on the depth of the pool body). For circular pools, it is nece-
ssary for the user to place the shaft in the oval pools to select the shaft excavation
from several locations exclusively in the circular part of the pool, which are shown
in Figure D-3. In the case of the construction of the shaft, it will also be necessary to
excavate (in the width of the bucket) between the collector space and the location
of the filtration. Take the drill from the filtration to the shaft or from the filtration
shaft to allow water to drain from the hoses during winter. Exercise perpendicular
to the pool (shaft) to create the right conditions for the assembly and dismounting
of pool hoses. Leave this excavation exposed so that it is possible to insert the pool
hoses into the drainage pipe before laying on the bottom of the trench. Do not
drain the drain pipe into the excavation!
Explanations to Figures 6-1 and 6-2
1 = Path of excavation, 2 = Trenching trench, 3 = Compacted sand layer up to 2 cm,
4 = Fill filler, 5 = Geotextile pad, 6 = Pool foil and wall, 7 = Skimmer, 8 = , 10 = bent
sheet, 11 = concrete bundle, 12 = shaft bottom, 13 = drainage pipe, 14 = masonry
shaft, 15 = soil, 16 =
IMPORTANT: It is necessary to check the ground water level at the building site
and whether it does not fluctuate depending on the season. It is also important to
classify the subsoil of the swimming pool, its absorption (especially with regard to
clays). The effect on groundwater status will also be the way of water withdrawal
from surrounding plots depending on the soil during the spring melting season or
during torrential rains. In the case of unfavorable hydrogeological conditions, it
is necessary to take appropriate measures to drain the land, basin drainage from
the bottom of the pool or build a sump alongside the pool where a submersible
pump with a level switch will be fitted and the water will be drained into the rainfall
or sewer.
Finishing job
When finishing works, the pool must be fully filled with water.
Exterior protection of the pool wall - Install a nop to the wall around the pool.
At the point of the collector, the foil should be cut off. This film protects the pool
wall against mechanical damage and provides moisture ventilation. ENSURING
THE STABILITY OF THE POOL CONSTRUCTION - The recessed pool is exposed to
ambient soil pressure and therefore it is necessary to increase the outer stiffness
of the pool wall construction by concrete coverings. If the pool is only covered with
sand, soil or other unpaved material, there is a risk of landslide and pool collapse.
Cover the pool with a drier concrete mix. Realization of the excavation pit for mul-
tiplying the pool by multiplying it by the decimetre depth reading. Mix sand (best
for river) and SPC 325 cement in a ratio of 5 sand shovels per 1 cement shovel. Mix
thoroughly dry and then moisten so that the mixture clutched together in the palm
of your hand (it did not fall apart or flow between your fingers). Splash the pool
around the two levels. First, about 5 cm below the level of the return nozzle at the
same time as the bottom of the shaft for the skimmer. Next day, build a shaft of
burned bricks around the collector and the return nozzle (see Figure 6-2). The top
of the shaft must be about 1-2 cm above the top of the pantograph. Then sprinkle
the concrete mix around the pool to your desired height. Ensure also drainage of
the shaft space to prevent rainwater accumulation. After curing the concrete, cut
the excess nopic foil.
Summary of Contents for Orlando Premium 10310019
Page 1: ...Baz n Orlando Premium N vod k mont i Ov l 3 66 5 48m Kruh 4 60m Kruh 5 48m CZ SK DE PL EN HU...
Page 22: ...22 Kontakty www marimex cz Z kaznick centrum tel 261 222 111 e mail info marimex cz CZ...
Page 43: ...43 Kontakty www marimex sk Z kazn cke centrum tel 421 233 004 194 e mail info marimex sk SK...
Page 131: ...131 2A 1 2A 3 2A 5 2A 7 2A 2 2A 4 2A 6 2A 8...
Page 132: ...132 2A 9 2A 11 2A 13 2B 2 2A 10 2A 12 2B 1 2B 3...
Page 133: ...133 2B 4 2B 6 2B 8 3 2 2B 5 2B 7 3 1...
Page 134: ...134 3 3 3A 2 3A 4 3A 6 3A 1 3A 3 3A 5 3A 7...
Page 135: ...135 3A 8 3A 10 3A 12 3A 14 3A 9 3A 11 3A 13 3A 15...
Page 136: ...136 3A 16 3A 18 3A 20 3A 22 3A 17 3A 19 3A 21 3A 23...
Page 137: ...137 3A 24 4 1 4 5 4 7 3A 25 4 2 4 6 4 8...
Page 138: ...138 4 9 4 11 4 13 4 15 4 10 4 12 4 14 4 16...
Page 139: ...139 4 18 4 20 5 1 5 3 4 19 4 131 5 2 5 4...
Page 140: ...140 5 5 5 7 5 6 5 8...
Page 141: ...141 6 1 6 2...
Page 144: ...25 let MARIMEX 1993 2018...