072010
33
Connect the coring head water delivery hose A
A
A
A to its connection B
B
B
B on the control panel
(fig. 41)
The valve D
D
D
D must be off.
Connect the water delivery hose to the connection C
C
C
C on the control panel .
Water delivery : 20-25 l/min
Open the valve D
D
D
D to feed water to the coring head.
Delivery pump connection to the coring head (optional)
Place the pump E
E
E
E near the water tank,, connect the inlet hose G
G
G
G to the pump suction
connection H
H
H
H , insert the inlet water hose in the tank , be sure that suction filter F
FF
F is installed.
Connect the machine inlet water hose to the pump : joint connection IIII to LLLL on the pump
and connection M
M
M
M to C
C
C
C on the control panel.
Start the pump engine and open the valve D
D
D
D to feed water to the head.
A
A
B
C
D
Figura 41
Figure 42
I
E
F
L
M
G
H
Summary of Contents for Quarry Votager
Page 56: ...072010 54 ...
Page 62: ...072010 60 EMERGENCY ELECTRICAL DIAGRAM GASOLINE MOTOR VERSION ...
Page 63: ...072010 61 EMERGENCY ELECTRICAL DIAGRAM DIESEL MOTOR VERSION ...
Page 64: ...072010 62 ELECTRICAL DIAGRAM ELECTRICAL MOTOR VERSION ...
Page 65: ...072010 63 ROPE SWITCH ADJUSTMENT ...
Page 66: ...072010 64 HYDRAULIC DIAGRAM ...
Page 67: ...072010 65 NOTE ...