Thank you!
Series 3 Digital Force Gauges
POWER
Quick Start Guide
Press the button to power on the gauge. Press and hold to power off. The
gauge may be powered either by the internal rechargeable battery or an AC
adapter/charger. The battery will last approximately 7 hours with the backlight
turned on, and 24 hours with the backlight turned off before recharging is
necessary.
Part No.
Qty.
M3-012 – M3-20
M3-50 – M3-100
1
12-1049
12-1049
1
AC1030 /
AC1031 /
AC1032/
AC1035
AC1030 /
AC1031 /
AC1032/
AC1035
1
08-1026
08-1026
1
G1024
G1024
1
G1026
G1026
1
G1025
G1025
1
G1027
G1027
1
G1029
G1029
1
G1028
G1038
1
N/A
G1039
1
09-1165
09-1165
2
3
LITERATURE & SOFTWARE DOWNLOADS
1. User’s guides
(PDF)
Provided for all Mark-10 instruments. Locate the user’s guide for this product
and read it thoroughly before use.
2. USB driver
For Mark-10 instruments and the model RSU100 RS-232 to USB converter.
Required for communication with a PC. Follow the installation instructions
provided in the user’s guide.
3. MESUR
®
family of software
– see below.
INSTALLING MESUR
®
SOFTWARE
Mark-10 offers three data collection applications:
MESUR
®
Lite
Free basic data acquisition application, for data tabulation and exporting to Excel.
Compatible with gauges only, not test stands.
MESUR
®
gauge / MESUR
®
gauge Plus
Data tabulation, graphing, analysis, and reporting, with user-configurable start and
stop triggers and other tools. Compatible with gauges and test stands for load
vs. time or load vs. travel. MESUR
®
gauge Plus adds test stand motion control
coordination. Both applications can be evaluated for 90 days.
PC requirements
Compatible with PCs running Microsoft Windows 7 or later. Minimum monitor
resolution is 1108 x 758. A USB or RS-232C serial port is required. If USB
communication is required, install the Mark-10 USB driver.
www.
GlobalTestSupply
.com
Find Quality Products Online at:
sales@GlobalTestSupply.com