INSTALLATION, OPERATION MANUAL, MODEL ETP-10E
8.0 ADJUSTMENTS
(Continued)
Exterior Panel Removal
WARNING: To prevent hazard in servicing the cooker, be certain
that the steam supply boiler is shut down, the cold water shut-off
valve is closed, and the electrical disconnect circuit breaker for the
Cooker/Boiler unit is OFF before removing side panels.
Access to all internal plumbing and electrical assemblies is from the right side. The right-side
panel is removed by removing the bottom screws from panel.
Part No. 10309R0
31
2019-05-14