CONFIDENTAL. DO NOT DUPLICATE OR REDISTRIBUTE
Pre-Install Guide_2.0.0 | September 11, 2018
16
PRE-INSTALL CHECKLIST
PRE-INSTALLATION GUIDE : METAL X SYSTEM
METAL X
□
Uncrate and move printer to final location
□
Installation location is environmentally controlled for temperature and humidity
□
Appropriate table / desk / stand for printer
□
Dedicated circuit at the printer location (see Facilities Guide for specifications)
□
Compatible Wi-Fi or Ethernet network connection
□
Metal and release material on hand
▷
Material is stored vertically or in original packaging and in a cool location
□
Print sheets on hand
WASH-1
□
Uncrate and move wash to final location
□
Installation location is environmentally controlled for temperature and humidity
□
No excessive air movement (fans, blowers, open doors, etc.) at wash location
□
Wash-1 location has adequate space to meet clearance requirements
□
Wash-1 location can support the fully loaded weight of wash station
□
Wash location is not excessively unlevel
□
Dedicated circuit at the wash location (see
Facilities Guide
for specifications)
□
4” round exhaust connected to Wash-1
▷ Measure exhaust and confirm it is at least 100CFM. Record CFM: ________
□
15gal. of Opteon SF79 on hand
□
Drum wrench on hand
□
0.01g resolution scale on hand