Rutland FM1803-2
Installation & Operation
Document No: SM-146 Issue G 01.11.20
Marlec Engineering Co Ltd
10
ASSEMBLY AND INSTALLATION OF THE TURBINE
Blade & Hub Assembly
Fig 3. Blade Hub Assembly
Correct position of front
hub plate to locate nose
cone fixing holes
Nose cone fixing
boss – 3 fixings
Flat Side of Blade
faces the wind
Front Hub Plate
Rear Hub Plate
Windshaft – note socket at
end to place 8mm Allen key
to hold during assembly