Rutland FM1803-2
Installation & Operation
Document No: SM-146 Issue G 01.11.20
Marlec Engineering Co Ltd
2
CONTENTS
Page
GENERAL SCHEMATIC
1
INTRODUCTION AND GENERAL GUIDELINES & WARNINGS
3
CHECK YOU HAVE RECEIVED
4
WHAT YOU WILL NEED – Tools, Other Items
4
SITING THE WINDCHARGER
5
SYSTEM DESCRIPTION AND PRINCIPLE OF OPERATION
6
Aerofoil Blades & Rotor
6
Generator
6
Yaw System
6
Tail Assembly
6
Control Unit – Connection features list
7
MOUNTING TOWER
9
ASSEMBLY AND INSTALLATION OF THE TURBINE
10
Blade & Hub Assembly
10
Tail Assembly
12
Tower Preparation
13
Control Unit Installation
14
BATTERIES
15
CABLE SPECIFICATION
16
FUSES
16
ELECTRICAL CONNECTION
17
CONTROL UNIT WIRING
18
FITTING THE GENERATOR TO THE TOWER
20
Final Mechanical check
20
UP AND RUNNING
21
LCD Display Features Explained
21
OPERATION EXPLAINED
22
Backlight
22
Low/High Wind Modes
22
Manual Shutdown
22
Batteries Fully Charged
22
Awaiting Re-set V
23
Other Modes/Messages
23
Run/Stop Switch – supplied separately
23
SPECIFICATION AND PERFORMANCE
24
INSPECTION AND MAINTENANCE
25
TROUBLESHOOTING
26
FM1803-2 MAINTENANCE SCHEDULE 1-12 MONTHS
27
FM1803-2 ONGOING MAINTENANCE SCHEDULE TEMPLATE
28