6
Installation
SUPPORT BRACKET
(WITH ADJUSTMENT SLOTS)
1/4" TAP SCREW
Piping to Tower
(Year–Round Operation)
1. If your tower must operate during freezing weather, it is recommended
that the tower be installed for gravity flow operation. See
Figure 1
.
2. Provide an indoor open type storage tank with a capacity that will
contain all water that will drain into the tank from the system during
shutdown.
. Connect tower outlet to storage tank. Bottom outlet option should
be used for gravity flow.
4. Install makeup water, bleed-off, overflow and drain lines on tank.
5. Insulate and heat water lines exposed to freezing temperatures.
Mechanical Equipment Installation
Aquatowers with factory-installed controls ship with the motor, sheave,
belt, and belt guard factory-installed. Remove shipping stiffener plate
and hardware at the adjustable end of the motor support plate and
proceed to Motor Electrical Connections.
Motor, Sheave, and V-Belt Installation
1. Check the motor nameplate to be sure its voltage, phase and frequency
ratings are the same as the power supply.
Note
Motor Frame Fastener Size
56–14T–145T
5/16"
182T thru 215T
/8"
Figure 2
➠
Summary of Contents for Aquatower 490A
Page 1: ... V iÊNÊ Ê ÀÞÊ ÊNÊ À iÞ Ê iV ià Marley Aquatower Cooling Tower User Manual 01 1248D ...
Page 2: ......
Page 27: ......