Increased Load Requirements QuadraFlow towers are designed such
that cells of either equal or unequal capacity can be added in the future. This
allows you to compensate for the load increases that normally occur with the
replacement or addition of production equipment—and still retain continuity
with respect to your cooling tower system.
Tower Renewal Marley routinely rebuilds and upgrades cooling towers
of all materials and manufacture. If your tower ever reaches the limit of its
service life, we recommend that you investigate the cost of rebuilding before
you routinely order a new replacement tower.
Each QuadraFlow tower includes a document package containing general
orientation drawings and manuals to accomplish field assembly and instal-
lation. These drawings and manuals contain important information
relating to safe installation and operation of the cooling tower. A
separate installation drawing for each purchased option is included in the
document package. If you have purchased an option and can’t find the ap-
propriate installation drawing, contact your local Marley sales representative
before proceeding.
SPX also provides several sets of a separate packet of pertinent operating
and maintenance manuals. The manuals vary somewhat depending on the
tower model purchased.
In addition, SPX publishes numerous technical reports including more detailed
information on a variety of cooling tower operation and service topics available
to download at spxcooling.com. For complete parts and service assistance,
contact the Marley sales or representative office in your area. If you need help
locating the office nearest you, please phone 60 3 7947 7800 or check the
web at spxcooling.com.