AS Martem Data Concentrator TELEM-GW6 User Manual
Akadeemia tee 21G Tel: +372 639 79 79 E-mail: martem@martem.eu
12618 Tallinn Fax: +379 639 79 80 www.martem.eu
Estonia
- 6 -
6. Typical Application for Electric Power Station
7. Switches
1 – Reset: Switch RESET to ON state and then back to OFF state for Reset
operation
2 – Dft. Set: To apply default setup:
1. Switch DFT. SET to ON state
*Alert indication LED starts blinking with 5 second interval
2. Switch DFT. SET back to OFF state when the alert indication LED is
blinking to apply default setup
*If DFT. SET is switched back to OFF state at a moment when the alert
indication LED is not blinking, default setup will NOT be applied
8. Indication
For operation
Green LED – Blinking green indicates that the program is running
Red LED – Failure
For communication
Yellow LED – RX
Green LED – TX
Green LED at GPS port – blinking indicates the existence of GPS time
synchronization.