© Martin Engineering GmbH
1
M3289UK-01/17
Table of contents
1
Table of contents
1
Table of contents ............................................................. 1
2
Introduction ...................................................................... 3
2.1
Concerning these installation instructions .......................... 3
2.1.1
Scope ............................................................................ 3
2.1.2
Copyright ....................................................................... 3
2.1.3
Exclusion of liability ....................................................... 3
2.1.4
Reference to additional documents ............................... 4
2.1.5
Classification of the hazards.......................................... 5
2.2
Intended usage .................................................................. 6
2.2.1
Conveyor systems with open transfer systems ............. 6
2.2.2
Usage in explosion-protected areas .............................. 6
2.2.3
Restrictions on the use of the product ........................... 6
2.3
Occupational safety............................................................ 7
2.3.1
Safety information, occupational safety ......................... 7
2.3.2
Duties of the owner-operator ......................................... 7
2.3.3
Authorised personnel ..................................................... 7
3
Description of the product .............................................. 8
3.1
Design and function ........................................................... 8
3.2
Type clarification ................................................................ 9
4
Preparing for the installation ........................................ 10
4.1
Before the installation....................................................... 10
4.1.1
Required materials and tools ....................................... 10
4.1.2
Preparatory measures ................................................. 10
5
Installation ...................................................................... 11
5.1
Safety information ............................................................ 11
5.2
Installation process .......................................................... 12
5.2.1
Determination of the installation position ..................... 12
5.2.2
Installing the tensioner................................................. 16
5.2.3
Installing the cleaner.................................................... 17
5.2.4
Electrical connection.................................................... 19
5.2.5
Centring the mainframe beneath the conveyor belt ..... 20
5.2.6
Aligning the mainframe parallel to the conveyor belt ... 22
5.2.7
Aligning the mainframe horizontally ............................. 23
5.2.8
Tensioning the secondary cleaner............................... 24
5.3
Test run ............................................................................ 26
5.4
Placement of warning labels and warning tags ................ 28
6
Maintenance ................................................................... 29
6.1
Safety information ............................................................ 29
6.2
Weekly maintenance ........................................................ 29
6.3
Replacement of the cleaning elements ............................ 31
6.3.1
Lowering of secondary cleaner.................................... 32
6.3.2
Replace cleaning elements ......................................... 34
7
Troubleshooting ............................................................. 37
7.1
Safety information ............................................................ 37
7.2
Troubleshooting .............................................................. 37
8
Storage, de-installation, disposal ................................. 39