© Martin Engineering GmbH
35
M3289UK-01/17
Maintenance
3.
Loosen the bolts from both sides of the pillow block (3, Fig. 15)
and pull it and the main shaft with the pillow blocks from the
chute.
4.
Loosen screws in the locking ring (1, Fig. 16) and the
adjustment ring for the zigzag system (2, Fig. 16) at one side
and pull off from the main shaft.
Fig. 14:
Fig. 15: De-installation of the cleaning elements
1
3
4
2
1
2