Martin Engineering M3829-08/13
2
Martin
®
Sonic Horns
Before Installing Sonic Horn
IMPORTANT
The delivery service is responsible for damage occurring in
transit. Martin Engineering CANNOT enter claims for
damages. Contact your transportation agent for more
information.
1. Inspect shipping container for damage. Report damage to delivery service
immediately and fill out delivery service’s claim form. Keep any damaged
goods subject to examination.
2. Remove sonic horn assembly from shipping container.
3. If you purchased accessories from Martin Engineering, they will be
packaged separately. Remove this equipment from its shipping container.
4. Take inventory of the equipment received. If anything is missing, contact
Martin Engineering or representative.
WARNING
!
Before installing sonic horn, lock out/tag out any equipment
that is loading or unloading material from the vessel.
5. Turn off and lock out/tag out energy source to accessory equipment
according to ANSI standards (see “References”).
WARNING
!
If equipment will be installed in an enclosed area, test gas level
or dust content before using a cutting torch or welding. Using
a cutting torch or welding in an area with gas or dust may
cause an explosion.
6. If using a cutting torch or welding, test atmosphere for gas level or dust
content.
Before Installation