© Martin Engineering GmbH
16
M3682UK-09/17
Installation
2. Mark the vertical and horizontal centre line of the driving drum
on the operator side of the chute wall to determine the centre
point (A, Fig. 4) of the driving drum. The vertical line must run
at a right angle with respect to the conveyor belt line.
3. Mark a position (E, Fig. 4) at a distance from 50 mm to no more
than 100 mm in the conveying direction (D, Fig. 1) from the
point at which the belt leaves the head pulley (C, Fig.4).
4. Draw a vertical line at this position (E, Fig. 4) going downwards
at a right angle to the conveyor belt.
5. Use the dimensions from Tables 2 and 3 to mark the installation
holes for the tensioner (G, Fig. 4).
6. Create the cut-out and installation holes as shown in Fig. 6/Fig.
7.
Installation SQ2, 41605, 41641
Tab. 5: Installation opening
Fig. 6:
*The cleaner should ideally be placed in the centre of the access port.
Item
Description
A
Blade-edge position
B
Access port
279
B
76*
76
Ø16
A
(152)
Summary of Contents for SQC2
Page 1: ...MARTIN SQC2TM Secondary cleaner Installation Instructions M3682UK...
Page 2: ...Martin Engineering GmbH M3682UK 09 17...
Page 54: ...Martin Engineering GmbH 52 M3682UK 09 17 Part numbers 9 9 SQC2 with SAF2 blades 0 5...
Page 63: ...Martin Engineering GmbH 61 M3682UK 09 17 Part numbers 9 12 SQC2 mini secondary cleaner 5 0...
Page 66: ...Martin Engineering GmbH 64 M3682UK 09 17 Part numbers 9 13 SQC2 tensioner...