© Martin Engineering GmbH
35
M3682UK-09/17
Maintenance
6
Maintenance
6.1
Safety information
6.2
Weekly maintenance
1. Shut off the power supplies of the conveyor belt and any
additional equipment and secure them against unauthorised
reactivation.
2. Remove all material deposits from the blade and the
mainframe.
3. Inspect whether all of the fastening parts are securely
tightened. Tighten any loose connections.
4. Check the cleaner tension and re-tighten if necessary.
5. Check the blades for wear, damage and missing parts.
NOTE
Maintenance inspections must be performed at least once a week.
Shorter maintenance intervals may be required depending on the
operating conditions.
NOTE
Read this section completely before starting any kind of work.
WARNING RISK OF INJURY!
Body parts and/or clothing may get caught and pulled in by
rotating parts or by the moving conveyor belt.
Shut off the power supply to the conveyor system and its
accessories and secure it against unauthorised reactivation before
performing any maintenance work.
Use warning signs!
Summary of Contents for SQC2
Page 1: ...MARTIN SQC2TM Secondary cleaner Installation Instructions M3682UK...
Page 2: ...Martin Engineering GmbH M3682UK 09 17...
Page 54: ...Martin Engineering GmbH 52 M3682UK 09 17 Part numbers 9 9 SQC2 with SAF2 blades 0 5...
Page 63: ...Martin Engineering GmbH 61 M3682UK 09 17 Part numbers 9 12 SQC2 mini secondary cleaner 5 0...
Page 66: ...Martin Engineering GmbH 64 M3682UK 09 17 Part numbers 9 13 SQC2 tensioner...