Installation
5.2.2
Installing the tensioner
The installation panel must first be dismantled from the tensioner
before it can be installed (see Section 4.1.3) and then installed in the
installation holes created in Fig. 5. Note the alignment of the panel
as shown in Fig 7.
1. Attach the installation panel (1, Fig. 8) to the chute wall in the
holes created in Fig. 6.
Fig. 8:
Fig. 9:
11
1