background image

 

 

9

Storage 

Rammer should be stored in such position as it is placed on level, after engine and machine have 

been cooled down. Be sure to secure the rammer as necessary to avoid falling down. If the rammer 

has to be laid down inevitably, tighten fuel tank cap and engine oil plug securely and wait until engine 

and machine are cooled down. After laying it down, make sure that there is no leak of fuel or oil. (If 

fuel leaks, drain the tank) 

 

Long-Term Storage

 

l

 

Drain fuel from fuel tank, fuel line and carburetor. 

l

 

Remove spark plug and pour a few drops of motor oil into cylinder. Crank engine 3 to 4 times so 

that oil reaches all internal parts. 

l

 

Clean exterior with a cloth soaked in clean oil. 

l

 

Store unit covered with plastic sheet in moisture free and dust free location out of direct sunlight. 

 

Specification 

 

Model 

EMR70H 

Motor 

Honda GX160 

Power kW (hp) 

4.0 (5.5) 

Operation Mass kg (lb) 

70 (154) 

Impact Force kN 

14 

Jumping Stroke mm 

50-80 

Fuel Tank Capacity L 

2.8 

Shoe Size mm   

350X285 

 

Acoustic Noise

 (According to 2000/14/EC) 

 

EMR70H 

Measured sound power level 

105dB 

Guaranteed sound power level 

107dB 

 

Working Size

 (L x W x H): 689X440X1080 mm 

 

 

 

 

 

 

 

 

 

 

 

 

 

Hand-Arm vibration

 Specification (According to ISO 5394, EN 1033 and EN500-4): 7.2m/s

2

 

Summary of Contents for EMR70H

Page 1: ...enance personnel must read and understand these instructions before operating changing accessories or performing maintenance on Masalta power equipment All possible situations cannot be covered in the...

Page 2: ...working by applying consecutive impacts to the surface of soil in order to level the uneven soil surface to compact the soil uniformly so that the void among soil particles are minimized and to increa...

Page 3: ...ed to prevent the possibility of improper service damage to the equipment or personal injury Notes Notes contain additional Information important t a procedure CAUTION Cautions provide information imp...

Page 4: ...engine OFF when rammer is not being operated ALWAYS guide the rammer in such a way that the operator is not squeezed between the rammer and solid objects Special care is required when working on uneve...

Page 5: ...alter engine speeds Run engine only at speeds specified in Technical Data Section Label Location ALWAYS replace safety devices and guards after repairs and maintenance ALWAYS keep area around muffler...

Page 6: ...rmation No sparks flames or burning objects near the machine Shut off the engine before refueling Use only clean filtered unleaded gasoline WARNING Always wear hearing and eye protection when operatin...

Page 7: ...rmation the serial number should be specified of the unit Prior to Starting the Operation l This machine is of oil bath lubrication system l Check the oil level through a window at rear end of the foo...

Page 8: ...g the choke level to open the choke Running the engine for 5 minutes at low speed to warm the engine 2 Move the throttle level quickly to the FULL OPEN position DO NOT move the throttle level slowly a...

Page 9: ...el of machine Check fuel line and fittings for cracks or leaks Tighten ramming shoe hardware Check and tighten engine cylinder screws Check and tighten external hardware Clean engine cooling fins Clea...

Page 10: ...Remove spark plug and pour a few drops of motor oil into cylinder Crank engine 3 to 4 times so that oil reaches all internal parts l Clean exterior with a cloth soaked in clean oil l Store unit cover...

Page 11: ...ner comes to top After laying it make sure that there is no leak of oil or residual fuel 7 Make sure lifting device has enough capacity to hold machine see identification plate on machine for weight U...

Page 12: ...clean ignition Fuel in use inadequate water dust Flush fuel system and replace with fresh fuel Mixed fuel quality is inadequate Check fuel to oil mixture Excessive carbon deposition in combustion cha...

Page 13: ...ed of parts or major service be sure to see your dealer For your convenience we have provided this space to record relevant data about your Tamping Rammer These products are covered by warranty for a...

Page 14: ...ENGINEERING CO LTD Add 20 Dalian Road Baohe Industrial Estate Hefei China Tel 86 551 64846601 64846580 Fax 86 551 64846616 64846626 E mail sales masalta com cn masalta mail hf ah cn Http www masalta c...

Reviews: