6
Hurunui Installation in Alcove/Recess situation
Hurunui burner models have been tested for alcove (recess) made of combustible material
and comply as per safety standard AS/NZS 2918:2001
Note –
- Refer to the table on
Page-3 for dimensions
- The ceiling height must be
a minimum of 2400mm
3.0 Installation of The Hurunui ULEB
3.1 Unpacking
Remove the shipping wooden crate and packing material around the burner. Remove the loose pieces from the
firebox. Remove and discard the screws holding the wood fire to the shipping pallet. Using appropriate lifting
equipment, move the burner close to its installation position. The installer should use correct lifting procedures to
avoid injury while handling a Masport Hurunui burner.
3.2 Positioning
The Hurunui ULEB is tested to and complies with parallel, corner, and alcove (2.4m ceiling height) wall
configurations, with minimum distances to heat-sensitive materials in accordance with the AS/NZ 2918:2001
safety test standard. Determine the installation position for your Hurunui fire only after considering the necessary
clearances (See Technical Specifications on page 5 of this manual) and checking the practicability of installing the
flue system. No wall or other fixed objects should be closer to the front of the Hurunui burner than two meters.
Regard heat-resistant walls with heat-sensitive surface treatments (e.g., wallpaper or heat-sensitive paints) as
heat-sensitive walls.
Any proposed deviation from the specified clearances or installation configurations should be discussed with a
registered “NZHHA” approved installer or GDNZ’s technical team to ensure that the variation complies with AS/NZ
2918:2001
3.3 Flue Requirements
A minimum 4.2M long, 150mm diameter Masport flue system or flue system that has been tested and complies
with the current installation standard AS/NZS 2918:2001, Appendix F shall be used with the Hurunui burner along
with the 900mm long, Masport St/St double skin flue shield. Clearances to combustible given on section 2.0 have
been determined during a safety test, which was carried out with standard parallel and corner installation
configuration with a minimum 2.4m high ceiling.