C-5
A
B
E
D
C
F
Mower deck installation
The muffler and surrounding areas may be hot.
1. Park tractor on a hard, level surface such as a concrete
floor.
Move the PTO switch (B) and ignition switch (E)
to the off position, remove the key, depress the brake
pedal (D), and apply parking brake (C).
2. If not already done, orient the discharge tube (G) as shown
and insert it up through the middle of the tractor.
3. Place cutting height adjust (F) in the lowest cutting position.
Place the mower deck lift lever (A) in the lowered position
also. Slide mower deck under the right side of tractor so that
mower deck hitch is aligned with front tractor hitch.
(procedure continues)
G
Summary of Contents for 1693685
Page 2: ...THIS PAGE INTENTIONALLY BLANK ...
Page 13: ...A 1 Safety rules and information ...
Page 19: ...B 1 Features and controls ...
Page 25: ...C 1 Operating the tractor ...
Page 36: ...C 12 ...
Page 37: ...D 1 Regular maintenance ...
Page 49: ...E 1 Adjustments and Service ...
Page 60: ...E 12 ...
Page 61: ...F 1 Troubleshooting ...
Page 66: ...F 6 ...