101
DO NOT DIVE.
23
DO NOT DIVE.
MAST3RPUR
TM
(IF EQUIPPED)
QUARTZ TUBE INSTALLATION
1.
Place the Sealing Ring on the Quartz Tube 3/4 inch from the open end.
2.
Insert the Quartz Tube partially into the UV Chamber Cap. Place the Lamp Retainer over the
open end of the Quartz Tube and slowly push in until it is touching the UV Chamber Cap.
3.
Place the Retainer Washers onto the Retainer Screws and screw the Lamp Retainer Screws until
the Lamp Retainer is completely seated against the UV Chamber Cap.
4.
After swim spa is refilled, turn the swim spa ON and check the seal around the Lamp Retainer
for leaks.
5.
Correct any leak found by carefully tightening the retainer screws making sure lamp retainer is
snug. Be careful not to over-tighten and damage lamp retainer. If leaking continues, contact
your Master Spas dealer for service.
6.
SHUT DOWN the swim spa once you have confirmed that there are no leaks.
7.
Install the UV Lamp as described in the “Installing the UV Lamp” instructions.
8.
Reinstall the Upper Enclosure Assembly to the Enclosure Base.
9.
The unit is now ready for normal operation.
Contact your Master Spas dealer for replacement Mast3rPur
TM
parts and scheduling service for this
regular maintenance.
NOTE:
The ozone hose and check valve connecting between the ozone generator and ozone
injector should be inspected and/or replaced, if necessary, every 12 months. Depending on
conditions of the air which is being brought in to the ozone generator, the ozone hose and
check valve can wear more rapidly. This regular maintenance is not covered under the swim
spa warranty.