INSTALLATION INSTRUCTIONS
17
1.) Put spa in final position that allows for access to equipment
and spa components.
2.) Remove front side panel (this is the side where the
main topside control panel is located) so the electrical
service can be hooked up to the spa system pack. The
panels can be taken off by first removing the three
black thumb screws located on each corner. On the
center panel there are four #2 Phillips screws that are
covered with a colored snap cap. Remove the caps to
access the screws for removal.
3.) Fill spa at least 1” above the filters. We recommend filling
the spa through the filter area.
4.) Turn the power on to the spa. Spa will go through its priming mode.
This lasts approximately 5 minutes.
5.) It may be necessary to bleed air from the pump(s) on your spa if, after start
up, your spa pumps do not operate.
Due to the nature of water flow and hydro-therapy pumps, please be advised
that air locking of pumps may occur. Master Spas has taken measures to
reduce the possibility of this, but it still may occur, especially after refilling
a spa. This is not a service covered under warranty.
To relieve an airlock situation, loosen the union (see picture) on the discharge
of the pump (see arrow on picture of pump below). Water should leak out.
Tighten the union and test the pump for proper jet flow. If needed repeat
process.
6.) Adjust water chemistry according to the instructions provided in the
“Spa Water Maintenance Section”.
7.) Your spa water will heat approximately 4˚ – 7˚ per hour for the 240 volt spas.
The Fit due to the large body of water contained will heat approximately
1˚ – 2˚ per hour. Heating times may vary depending on the spas size and
whether the cover it installed.
RELAX AND ENJOY.
Pump Union
Airlock