9
NOTE: SALT SETTING AND CAPACITY ARE PRESET AT THE
FACTORY.
Final Check:
1. Fill the brine tank with Solar Salt and the Res-Up Feeders with
Res-Up (one quart is provided).
2. Make sure the drain line connection meets all plumbing codes and
that the drain line size can handle the backwash flow rate of the
Tannin unit.
3. Make sure the Inlet and Outlet on the bypass valve are open.
4. Make sure the control valve timer is plugged into an electrical
outlet with power 24 hours per day.
5. Check all piping for leaks.
IMPORTANT NOTE:
The treated water alkalinity level will be slightly reduced by the
Anion unit which decreases the pH level of the water.
You should consider installing pH control after this unit; it could be
an acid neutralizer or chemical feed system.
We include a mixing valve to assist in blending treated and untreated
water to achieve the water quality desired and simultaneously
increase the alkalinity and pH. The mixing valve may have to remain
closed because of the severity of the water condition. In that case, if
pH is too low, then treatment would be required.
Summary of Contents for MP-MCA Series
Page 12: ...11 ...
Page 13: ...12 ERROR CODES ...
Page 14: ...13 ...
Page 20: ...19 ...
Page 21: ...20 ...
Page 22: ...21 ...
Page 23: ...22 ...
Page 24: ...23 ...
Page 32: ...ERROR CODES ...
Page 33: ......