3
6. Locate the tail piece kit that is packaged with the control valve.
Align a tail piece assembly to the bypass valve threaded inlet and
Outlet until the nut can be tightened. Hand tighten because
excessive tightening will damage the assembly.
REPEAT THE
PROCEDURE FOR THE OUTLET CONNECTION.
Service and Drain Piping:
1. Pipe water combination unit into the service lines .The inlet and
outlet connections of the control valve are located on the back of
the valve body. As you face the timer the inlet is on the right and
the outlet is on the left. Always follow local plumbing codes when
installing our water treatment equipment.
2. If sweat fittings are used, be sure soldering is done in such a
manner as not to allow heat to reach the control valve or bypass.
(If Schedule 80 PVC is used make sure to follow the proper
primer and solvent instructions.)
3.
The drain line connection is 5/8” OD or ¾” npt and is located on
the top left of the valve as you face the timer. It is recommended
you install a ¾” union on the drain line for servicing if not using
5/8 OD. The drain line must be of adequate size to allow for full
regeneration flow.
Control Valve
Bypass Valve
Tail piece assembly
Summary of Contents for MP-MCA Series
Page 12: ...11 ...
Page 13: ...12 ERROR CODES ...
Page 14: ...13 ...
Page 20: ...19 ...
Page 21: ...20 ...
Page 22: ...21 ...
Page 23: ...22 ...
Page 24: ...23 ...
Page 32: ...ERROR CODES ...
Page 33: ......