Step 1
Turn UHF element and open UHF Dipole
to 90º to boom until they snap into place.
See diagram.
Step 3
Attach ribbon lead to G Unit
®
by removing
wing nuts and place one lead end on top
of each nut. Replace wing nut and tighten.
Step 4a
Strip coax cable as shown in Fig 4A.
Fold shielding braid back over cable jacket.
01MM-DE13
UHF/VHF Caravan Antenna Installation Instructions
Cable Jacket
Shielding Braid
Dielectric
Core Conductor
6 m m
6 m m
Step 2
Attach double folded dipole ('G' Unit
®
) to boom
using the 6mm (1/4") hex head bolt washers & wing
nut. Ensure elements are on the top side of the
boom & the 'G' Unit
®
is attached to the topside of
the boom using the hole closest to the UHF element.
See diagram.
For areas where UHF is horizontal and VHF
vertical polarized, or visa-versa, attach UHF
section 90º to VHF section. See Fig 9A.
Step 5
Select RG6 connector with plain knurled body that is
supplied. Place “F” connector on back to front and
twist to ensure that all braid is flat. See Fig 5.
Step 4
Cut rubber boot seal as in Fig 4.
Feed balun cable through boot seal.
DE13 6-15
Step 2a
Assemble UHF
Boom to VHF boom
as per diagram using
5mm screw and wing
nut provided.
by
EXPLORER