background image

Step 6
Then insert cable into rear of connector and
twist connector clockwise until dielectric is
flush with the bottom nut as in Fig 6.

Ensure that 2-3mm of centre
core conductor protrudes past the nut.

Step 7
Attach nut of connector to “Female connector” on antenna
and tighten finger tight.
WARNING OVER TIGHTENING MAY DAMAGE CIRCUIT BOARD.
Slide boot seal onto balun lid. See Fig 7.

Step 8
Assemble “U” bolt into boom.
See Fig8.
NB In vertical polarized areas,
mount “U” bolt in the holes
punched at 90 degrees
on adjacent face of boom.

Step 9
Attach antenna to mast and point to
transmitter as per Fig 9. Rotate
antenna to achieve best results.
Attach cable to mast with UV grade
insulation tape or UV grade cable ties
to support cable weight and avoid
damage to connection from
wind whiping cable from side to side.

For any technical enquiries, please call our technical department

at Matchmaster on 1800-AERIAL 

(N.Z. 0800-AERIAL).

DE13   6-15

Step 9A – OPTIONAL
For areas where UHF is horizontal and VHF
is vertical polarized or visa-versa, attach
UHF section 90º to boom as per diagram
or VHF section 90º to boom.

Refer to the caravan reception guide for
signal polarity in region required.

To Transmitter

Reviews: