Operation
Page 12
3.6
Attachment kit for original John Deere front PTO shaft
3.6.1
Installation of the front PTO shaft front
Mount the bearing shells together with the ball bearings (scope of delivery
– original John
Deere front PTO shaft) on the holder of the front PTO shaft. To mount the drive shaft
holderpull out the arrest bar (included in the scope of delivery of the attachment bracket)
and slide the pre-assembled drive shaft holder into the attachment bracket.
Fig. 9: Drive shaft holder for JD front PTO shaft without mounted bearing shell
3.6.2
Installation of the original John Deere universal joint shaft
1.
Guide the hexagon profile of the universal joint shaft through the front bearing.
2.
Press the locking pin (locking ring) on the outer fork of the universal joint shaft.
3.
Slide the outer fork onto the profile stub of the mid-mount PTO shaft of the tractor
and release the locking pin (locking ring).
4.
Slightly move the universal joint shaft back and forth until the locking pin audibly
locks in place.
4
Operation
Before starting up the implement, read the instructions on safety and han-
dling for operation of the entire implement and connection to the tractor. In
addition, prior to start-up you must ensure that the vehicle meets the re-
quirements specified in the German Road Traffic Vehicle Licensing Act.
The front power system should only be placed in service if all safety devices
are attached and fully functional. Prior to starting work the operator must
familiarize himself with the device and ensure for himself that the entire de-
vice is operationally reliable.
Moving objects and fixtures, (ropes, chains, linkage, etc.) must be adequate-
ly secured before transport or driving on public roads to exclude the danger
of accident or hazards to third persons.