47
9.7 PULLEY AXLE SET REPLACEMENT
1) Turn off the power and disconnect the cord from the machine.
2) Remove both front disks from the machine as outlined in Section 9.1.
3) Loosen the belt tension bolt on the right side until there is enough slack to remove the drive belt (Figure A).
4) On the right side of the frame, remove the retaining clip that holds the pulley axle bearing into the frame (Figure B).
5) On the left side of the frame, remove the retaining ring that holds the pulley axle bearing into the frame (Figure C).
6) Remove the pulley axle set assembly from the frame. Clean any debris from the hole in the frame (Figure D).
7) Reverse Steps 1-6 to install a new pulley axle set. Rotate the pulley to make sure that the motion is smooth and that there is no wobbling to
one side. Re-install the belts as outlined in Sections 9.5 and 9.6.
8) Test the Ascent Trainer for function as outlined in Section 9.22.
FIGURE A
FIGURE B
FIGURE C
FIGURE D
CHAPTER 9: PART REPLACEMENT GUIDE
Summary of Contents for A7X-04
Page 4: ...1 SERIAL NUMBER LOCATION CHAPTER 1 SERIAL NUMBER LOCATION 1 1 SERIAL NUMBER LOCATION...
Page 31: ...28 8 1 ELECTRICAL DIAGRAMS CHAPTER 8 TROUBLESHOOTING...
Page 32: ...29 8 1 ELECTRICAL DIAGRAMS CONTINUED CHAPTER 8 TROUBLESHOOTING P21 Digital Communication Wire...
Page 33: ...30 8 1 ELECTRICAL DIAGRAMS CONTINUED CHAPTER 8 TROUBLESHOOTING P25 Hand Pulse Connecting Cable...
Page 92: ...89 NOTES...