35
9.2 fRont SHRoud REplacEMEnt - continuEd
12) Remove the 9 screws to detach the front shrouds from the frame (or each other) (Figure M).
13) Turn the crank to the slotted portion of the shroud (Figure N).
14) Remove the front shrouds for frame access (Figures O & P).
15) Reverse Steps 1-14 to install new shrouds.
note:
The bolt / nut removed in Step 5 should be torqued to 70 N-m.
figuRE p
figuRE n
figuRE o
figuRE M
cHaptER 9: paRt REplacEMEnt guidE
Summary of Contents for E5X-04
Page 4: ...1 1 1 SERIAL NUMBER LOCATION SERIAL Number LOCATION CHAPTER 1 Serial Number Location...
Page 18: ...15 8 1 Electrical DiagramS CHAPTER 8 Troubleshooting HURES5x C Electrical block diagram...
Page 19: ...16 8 1 electrical diagramS CONTINUED Pulse Sensor Wire Chapter 8 Troubleshooting...
Page 21: ...18 POWER RESISTANCE WIRE ECB Wire 8 1 electrical diagramS Continued CHAPTER 8 Troubleshooting...
Page 24: ...21 8 4 LCB1_ErP wiring connection CHAPTER 8 Troubleshooting...
Page 84: ...81 notes...