Matrix ETERNITY Quick Start
3
Installing the ETERNITY
Before you Start
Before you begin the installation of the ETERNITY ME/GE/PE, make sure that the
required telecom wiring has been done and you have the following items ready:
•
A Main Distribution Frame (MDF)
•
A suitable location to install the Main Distribution Frame and the ETERNITY
hardware. If you want to install the mobile card, make sure the place you select
has sufficient signal strength.
•
Cables for trunk lines and extensions.
Terminate the trunk lines from the service provider network and the extension
lines from the field phones into the Main Distribution Frame.
•
The Cards of ETERNITY, as required.
•
One or more Single Line Telephone or Digital Key Phones, or IP Phones for
testing.
•
Power supply.
The ETERNITY ME, GE and PE work with input voltages ranging between 100-
240VAC. Arrange for a separate power point and switch, close to the system.
Power supply for the system must be separate from other heavy electrical loads
like Air-conditioners, heaters, welding machines, electrical motors, etc.
•
One or more active Two-wire trunk lines for test calls.
•
A modem for the ISDN T1E1PRI line.
•
An NT1 termination device for the ISDN BRI line.
•
Appropriate cables and connectors to set up and test the Ethernet interface of
the ETERNITY and the LAN connection.
Summary of Contents for ETERNITY GE
Page 1: ...ETERNITY Quick Start ...
Page 2: ......
Page 3: ...ETERNITY The IP PBX with Seamless Mobility and Universal Connectivity Quick Start ...
Page 8: ...2 Matrix ETERNITY Quick Start ...
Page 58: ...52 Matrix ETERNITY Quick Start ...
Page 90: ...84 Matrix ETERNITY Quick Start ...
Page 91: ...Matrix ETERNITY Quick Start 85 Appendix Universal Slots ETERNITY ME16S ETERNITY ME10S ...
Page 93: ...Matrix ETERNITY Quick Start 87 ETERNITY PE6S ETERNITY PE3SP ETERNITY PE3SS ...
Page 123: ...Matrix ETERNITY Quick Start 117 ...