background image

Tools Requirement

Adjustable Spanner

M12 Spanner

Bracket Spacing &
Installation Sample 

5

/

5

4.22

4.30

4.20

4.21

Summary of Contents for MS-MBA-2-L2

Page 1: ...panner M12 Spanner Bracket Spacing Installation Sample Revision History info matsing com www matsing com 1 5 1 30 1 40 1 Apr 2021 Date Description Revised by Revision nos 01 04 21 Update the latest information and included MBA 2 T2 into same instruction manual Ray Ling 1 email website Page 4 12 4 20 4 21 4 22 4 00 4 10 4 11 4 30 Ray Ling Patrick Yeo Date Prepared by Approved by MS MBA 2 L2 MBA 2 T...

Page 2: ...ble Connector Detail Connector Layout Page 2 5 1 20 MS MBA 2 L2 MBA 2 T2 Connector Table BEAM 2 BEAM 1 Port 3 45 1 30 1 40 1 00 1 10 Port 1 45 Port 4 45 Port 2 45 Port 1 45 Port 2 45 Port 3 45 Port 4 45 BEAM 1 BEAM 2 MS MBA 2 L2 MBA 2 T2 REAR VIEW CONNECTOR LAYOUT AISG ...

Page 3: ...LB Frequency 698 960 MHz TB Frequency 617 896 MHz Vertical Pattern 3 5 Page 2 00 2 10 2 11 2 12 2 20 698 960 MHz Frequency MS MBA 2 L2 617 896 MHz Frequency MS MBA 2 T2 698 960 MHz Frequency MS MBA 2 L2 617 896 MHz Frequency MS MBA 2 T2 ...

Page 4: ...p behind the element whose tilt is to be adjusted By Default the knob is on engaged mode pull out the handle for manual tilt adjustment turn the handle to change the tilt When done push the handle back in screw the waterproof cap back to the position 1 Size Qty Bracket 2 3 4 00 4 10 nos Model Apply 3 00 Unscrew Screw the cap for tilt adjustment process Engaged with internal RET motor position Pull...

Page 5: ...Tools Requirement Adjustable Spanner M12 Spanner Bracket Spacing Installation Sample 5 5 4 22 4 30 4 20 4 21 ...

Reviews: