4 Operation
14
DOEF series
Matsusada Precision
4 Operation
4-1 Basic Operation
4-1-1 Power-up
Set the POWER switch to ON.
The unit displays the start-up screen and carries out self-check for approx. four seconds. After the
check is finished, the operational screen is displayed.
Before turning on the POWER switch, check the following connection.
Input AC cable
Output cable
The unit may not work correctly if the wiring is done while the POWER switch sets to ON.
[If the start-up screen lasts for 20 seconds or more]
Although the unit checks the memory in the self-check, if an abnormality is found during it, the
memory will be initialized.
It will take approx. 20 seconds. Do not set the POWER switch to OFF during it. Otherwise, the
memory is not correctly initialized.
Such abnormality may occur by the POWER switch being turned off during memory write or by
external noise. If this phenomenon occurred, please contact us.
P OW E R s wi t c h
M a t s u s a d a Pr e c is io n I n c .
h t t p : / / w w w. m a t s u s a d a . c o m
F i g . S t a r t - u p s c r e e n
Summary of Contents for DOEF Series
Page 1: ...Instruction Manual F RA 001 3R2 MODEL DOEF series B N 243 9 024 243 9 024 Rev 0 4 ...
Page 15: ...2 External Appearance 7 DOEF series Matsusada Precision 2 3 Dimensions 2 3 1 400W Model ...
Page 16: ...2 External Appearance 8 DOEF series Matsusada Precision 2 3 2 600W Model ...
Page 17: ...2 External Appearance 9 DOEF series Matsusada Precision 2 3 3 1200W Model ...
Page 121: ......
Page 123: ......
Page 124: ......