50
NB! The battery is not fully charged on
delivery. It must be charged for about 3
hours prior to use. After that, charging takes
1 hour. The battery cannot reach full capacity
until it has been charged and discharged
around 5 times.
Preparation
Changing bits
Switch the direction selector (4) to its centre
position.
Turn the chuck (1) by hand to open the jaws
of the chuck. Insert the required drill bit into
the chuck and retighten.
Check that the bit is in the centre of the
chuck and is secure.
Selecting direction
Select direction (left or right) using the
switch (4).
If the switch is placed in the centre position,
the on/off button cannot be pressed in and
the drill cannot be started.
Selecting speed
Push the gear selector (3) to position 1 to
select low speed and high torque, or position
2 for high speed and lower torque.
NB! The gear selector must not be moved
while the chuck is rotating!
Selecting torque
Select the torque by turning the torque
selector (2) to the required position. The
higher the setting, the higher the torque
applied. To drill, turn the torque selector to
the position with the drill symbol.