29
Safeguard the sub-assembly with the retaining
pin.
Place the O rings for the capillary control tube into the top and bottom covers and use the
capillary control tube to push the O ring into the boring till to the stopper.
Slightly push the top and bottom cover
together and insert the capillary control tube.
Carefully push the air drive part together until
the air cylinder fits closely to the top cover.
Summary of Contents for DLE 5
Page 6: ...6 ...